Concrete products×川本コンクリート工業所 - List of Manufacturers, Suppliers, Companies and Products

Concrete products Product List

1~15 item / All 18 items

Displayed results

[Concrete Product Example] Gifu Prefecture: Well-side Semi-official Φ1200×H600

Safe travels to Kani City, Gifu Prefecture! We also handcraft pallets in sizes that perfectly fit the products.

Here is a case study of the "Well Side Half Pipe Φ1200×H600" in Gifu Prefecture. Well side inner diameter 1200×H600, inner diameter 1200, thickness 85, diameter 1370, height 600, weight: 500kg. For customers from afar, our company carefully packages the product with a handmade pallet that perfectly fits the size. Please feel free to contact us if you have any requests. 【Case Overview】 ■Product Dimensions ・Well Side Half Pipe Φ1200×H600 (Inner diameter 1200, thickness 85, diameter 1370, height 600, weight: 500kg) ■Installation Location: Kani City, Gifu Prefecture ■Installation Period: April 2024 *For more details, please refer to the related links or feel free to contact us.

  • Wells and hot springs

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Mie Prefecture: PC Catch Basin U-shaped Sloped Wall

The manhole connecting to the slope or embankment is made according to the angle! It is divided into weights suitable for the site.

Here is a product case of the "PC drainage basin U-shaped sloped wall" in Mie Prefecture. The basins that connect to slopes and embankments are manufactured according to the angle. They are divided into weights suitable for the site. We are constantly challenging ourselves with new precast products. Please feel free to contact us if you have any requests. 【Case Overview】 ■Product Dimensions: PC drainage basin U-shaped sloped wall 2000×1500×H2000 ■Construction Location: Toba City, Mie Prefecture ■Construction Period: March 2024 *For more details, please refer to the related links or feel free to contact us.

  • Concrete Retaining Wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Kyoto Prefecture: Sloped Slit Cover

There is a slit running through the center with a 1% slope from the outside!

Here is a product example of the "slit cover with slope" in Kyoto Prefecture. It was shipped sequentially from June to December of the 5th year of Reiwa. The slit runs through the center and has a 1% slope from the outside. The surface features a washout of black gravel, which adds an accent and harmonizes with the streets of Kyoto. 【Product Dimensions】 ■A: Sloped decorative slit cover w600×t110×L1000 ■B: Sloped decorative slit cover w600×t110×L1000 with 300□G cover ■D: Sloped decorative slit cover w600×t110×L1000/w600×t140×L1000 ■E: Sloped decorative slit cover w600×t140×L1000 with 300□G cover *For more details, please refer to the related links or feel free to contact us.

  • Paving Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Gifu Prefecture: Well Side Φ1500

We will introduce the construction of the well side with a diameter of 1500mm, height of 1000mm, and thickness of 125mm!

Here is a product case of "Well Side Φ1500" in Gifu Prefecture. We delivered it to Gero City, Gifu Prefecture. Fortunately, there was a delivery service going to Gifu, so we delivered it together. If you are not in a hurry for immediate delivery and have some flexibility with the delivery time, please feel free to contact us. 【Case Overview】 ■ Product Dimensions: Well Side Φ1500×H1000 Thickness 125 ■ Installation Location: Gero City, Gifu Prefecture ■ Installation Period: February 2021 *For more details, please refer to the related links or feel free to contact us.

  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Mie Prefecture: PC Drainage Pit Split into 3 Parts

Change from on-site casting design to precast! Reinforcement during product lifting is blue angle.

Here is a product case study of the "PC drainage basin divided into three parts" in Mie Prefecture. We changed from on-site design to precast, submitted structural calculations, and received certification. To reinforce the product during lifting, we have included blue angles, which will be cut after installation. Please feel free to contact us if you have any requests. 【Case Overview】 ■Product Dimensions: PC drainage basin T-25 standard mesh BT fixed ・Divided into three parts, with 7 ladders, bottom attached 150, 1,100□×H2,400(2,600) ■Construction Location: Tsu City, Mie Prefecture ■Construction Period: May 2021 *For more details, please refer to the related links or feel free to contact us.

  • Rainwater tank

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Mie Prefecture: Special G300 Slant

The drainage angle was adjusted to match the steep slope of the sudden incline and was aligned with the same gradient as the slope.

Here is a product example of "Special G300 Slope" in Mie Prefecture. The drainage angle was adjusted to cross a steep slope and road, matching the same incline as the slope. The product dimensions are standard size w330×L1000×H509/654. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product Dimensions: Special G300 Slope Standard Size w330×L1000×H509/654 ■ Installation Location: Ise City, Mie Prefecture ■ Installation Period: January 2021 *For more details, please refer to the related links or feel free to contact us.

  • Road facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Aichi Prefecture: Orifice Box

It is also possible to divide by weight according to the on-site application! The custom-made factory will assist you.

Here are some product examples of "orifice chambers" in Aichi Prefecture. The product dimensions are 1000□×H1220(1370) with a wall thickness of 150, internal partition H670×t100 t6, fine mesh, two-chamber type, two-part, SUS screen, with orifice plate. It is also possible to divide by weight according to the application on site. Our custom-made factory will assist in shaping your ideas. 【Product Dimensions】 ■ Orifice chamber 1000□×H1220(1370) wall thickness 150 ■ Internal partition H670×t100 t6 fine mesh two-chamber type two-part SUS screen with orifice plate ■ Orifice chamber 1000□×H1050(1200) wall thickness 150 ■ Internal partition H670×t100 t6 fine mesh two-chamber type two-part SUS screen with orifice plate *For more details, please refer to the related links or feel free to contact us.

  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Aichi Prefecture: Pit Foundation

The construction speed increases with each repetition! Experience leads to further evolution.

Here are some product examples of "pit foundations" in Aichi Prefecture. The product dimensions for the vehicle maintenance pit foundations are as follows: - Foundation (A) 4930×2555×H450 + H40, with angles - Foundation (B) 2110×2820×H400 + H40, with angles - Foundation (C) 1630×3140×H430 + H40, with angles Please feel free to contact us if you have any inquiries. 【Case Overview】 ■Product Dimensions - Vehicle Maintenance Pit Foundation (A) 4930×2555×H450 + H40 with angles - Vehicle Maintenance Pit Foundation (B) 2110×2820×H400 + H40 with angles - Vehicle Maintenance Pit Foundation (C) 1630×3140×H430 + H40 with angles ■Construction Location: Nagoya City, Aichi Prefecture ■Construction Period: August 2023 *For more details, please refer to the related links or feel free to contact us.

  • Subsidiary materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Saitama Prefecture: Half Masu 240

Shipping by route service to Saitama Prefecture! We will introduce product examples from Kawamoto Concrete Industry.

Here is a case study of the "Hanmasu 240" product in Saitama Prefecture. The product dimensions are internal dimensions of 240×240×H200 with a wall thickness of 30. It was shipped to Saitama Prefecture via scheduled delivery. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Product Dimensions: Internal dimensions 240×240×H200, wall thickness 30 ■ Installation Location: Iruma District, Saitama Prefecture ■ Installation Period: April 2021 *For more details, please refer to the related links or feel free to contact us.

  • Subsidiary materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Mie Prefecture: Rooftop Weight

We will introduce examples that focus on the form with chamfering!

Here is a case study of "rooftop weights" in Mie Prefecture. We delivered them to the rooftop of a major factory in Tsu City. They plan to create a break area on the rooftop, so they will insert columns into square holes to serve as the foundation. We also paid attention to the form with chamfering. 【Case Overview】 ■Product Dimensions: Rooftop Weight 400×2,100×H500 with 126□ holes in 2 locations ■Installation Location: Tsu City, Mie Prefecture ■Installation Period: March 2021 *For more details, please refer to the related links or feel free to contact us.

  • Subsidiary materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Osaka Prefecture: Machine Hatch Set of 3

A weight reduction of approximately 600kg! We will introduce a case where it was manufactured with simple waterproofing and a lightweight design.

Here is a product case of the "Machine Hatch 3-piece set" in Osaka Prefecture. It was requested to be made lightweight and with simple waterproofing, so there are SUS angles attached on all four sides at the bottom, and a flat plate is embedded at the top. Additionally, to reduce weight, the center is knocked out to make it thinner, and for simple waterproofing, a step is created at the left and right connection points, and waterproofing is applied with rubber. 【Case Overview】 ■ Product Dimensions: Machine Hatch Simple Waterproof Specification w3,290×t180×L3,710 ■ Installation Location: Suita City, Osaka Prefecture ■ Installation Period: December 2022 *For more details, please refer to the related links or feel free to contact us.

  • Subsidiary materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Wakayama Prefecture: Well Side Φ1500 BB Specification

Specifications resistant to seawater! BB cement was arranged and produced.

Here is a product case of the "Well Side Φ1500 BB Specification (Blast Furnace)" in Wakayama Prefecture. This well side has a different cement mix, and BB cement was arranged for its production. It is designed to be resistant to seawater. Therefore, a slightly longer delivery time is required. Please feel free to consult us when you need our services. 【Case Overview】 ■Product Dimensions: Well Side Φ1500×1000 BB Specification, Well Side Collection Φ1500×1000 BB Specification ■Construction Location: Wakayama Prefecture ■Construction Period: April 2021 *For more details, please refer to the related links or feel free to contact us.

  • cement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Nara Prefecture: Generator Foundation

Unloading starts at 11 PM! A speedy installation case completed in 30 minutes.

We would like to introduce a product case of the "Generator Foundation 900×3000×H1100" in Nara Prefecture. The foundation for an emergency generator unit, weighing 7t200kg, was delivered to a national road in Nara Prefecture. Unloading started at 11 PM, and installation was completed in 30 minutes, showcasing a sense of speed. The long traffic restrictions during the night, the high costs of arranging fresh concrete at night, long working hours, and the concerns regarding the curing period after concrete pouring and the labor involved in formwork dismantling were all resolved. 【Case Overview】 ■Product Dimensions: Generator Foundation 900×3000×H1100 ■Construction Location: Nara City, Nara Prefecture ■Construction Period: September 2022 *For more details, please refer to the related links or feel free to contact us.

  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Osaka Prefecture: (Custom) Non-slip GC Cover

We will introduce a case where blue anti-rust paint was used and finished beautifully.

Here is a product case of the "(Custom) Non-Slip GC Cover" in Osaka Prefecture. The surface features a non-slip raised stripe pattern, and the sides are reinforced with a steel plate (PL3.2) for added strength. The handles are equipped with Uni-Chrome plated bolts, making it easy to lift. This product can be custom-made in any size. 【Case Overview】 ■ Product Dimensions - (Custom) Non-Slip GC Cover 650×650×100 (650×325×100) - 2 pieces per set - (Custom) Non-Slip GC Cover 950×950×100 (950×475×100) - 2 pieces per set - (Custom) Non-Slip GC Cover 1050×1050×100 (1050×525×100) - 2 pieces per set ■ Installation Location: Sakai City, Osaka Prefecture ■ Installation Period: March 2022 *For more details, please refer to the related links or feel free to contact us.

  • Inspection hatches, manhole covers, and ditch covers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Example] Hiroshima Prefecture: Well Side 1500

The middle and bottom parts have water leak prevention rubber seals! There are through holes on the sides.

Here is a case study of the "Well Side 1500" product in Hiroshima Prefecture. We also handle the arrangement of heavy machinery and installation work upon request. The middle and bottom sections are equipped with water-stopping rubber to prevent leaks. The bottom is designed to be bottomed out, and at the top, we have added a through hole on the side as per the customer's request. We also accept installation work. Please feel free to contact us if you have any requests. 【Case Overview (Partial)】 ■ Product Dimensions - Top: Well Side Φ1500 × Total H500 - Middle: Well Side Φ1500 × Total H500 - Bottom: Well Side Φ1500 × Total H500, bottomed out - For Well Cover Φ1500 *For more details, please refer to the related links or feel free to contact us.

  • Wells and hot springs

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration